Finished poster for Major assignemt showing all aspects involved and the erection of tilt up construction intersecting with steel universal column.

Research for Assignment


The diagram shows the importance of planning involved in concrete tilt up construction. The placement of the panels once lifted into position and the temporary bracing before connection to steel frame.

Site Visit


This picture shows Universal column with the reinforcing for concrete to be poured. The finished column is on the left and the work in progress is on the right.

Site Location

Multiplex Site
Cnr, Bourke & William Street
Melbourne

Site Visit

Connection of Universal column and Universal Beam. This photo also shos the reinforcment for concrete to be poured around the colunm for additional fire protection.

Site Location

Multiplex Site
Corner Bourke Street, Williams Street
Melbourne

Major Assignment research



Structural engineers sketch of Universal beam connection to existing concrete slab

Architectural detail- Corner of factory using non structural tilt up construction. The connection shows location but does not nominate the size of universal columns or panels.

Assignment research


Architectural Drawing of proposed Factory.

The drawing shows the importance of the grid system and the relation of this to the structural and design detaing for the building. All drawings will relate to the image and grid set out by Architect.

Assignment research


The diagram show the stach casting arrangement for tilt up construction
taken from the Tilt Up concrete construction handbook.

Major Assignment research


This diagram was taken from the Concrete Tilt up manual, Concrete Association of Australia and shows the lifting inserts required for a centre and edge lift of concrete panels.
These teqniques can be adopted for both tilt up and pre-cast construction.

This picture shows the vertical formwork and whaling systems utilised when concrete poured on site. This is for a central stairwell shaft that continues from floor to floor.

Site Location

AXA Building
Grocon Constructions
750 Collins Street
Docklands, Melbourne

Site Visit- General concrete construction


This picture shows the reinforcment within a band beam construction and the connection of band beam to slab. We can see the bond deck, and the plywood panels used for formwork.

Site Location

AXA Building
Grocon Constructions
750 Collins Street
Docklands, Melbourne

Site Visit

This picture shows a pre cast panel in position on site and the temporary bracing required to support the panel.

Site Location

AXA building
Grocon Construction
750 Collins Street
Docklands, Melbourne

Major Assignment research

Engineers Drawing Universal column and Beam connection.

The drawing shows position and type of bolts used for the nominated connection of steel mambers. This drawing was gained from a structural engineer.

Major assignment Research


This is a photo of shop drawings for the production of pre cast concrete panels. The drawings nominated the reinforcing, size, weight of each panel for proposed building.

Major Assignment research


Structural Engineers Drawings

This is a picture I have gained of a factory proposal from Consulting Structural Engineers located in Heildelberg, Melbourne.

The drawing shows the nominated Universal columns and Beams for the project.

Thursday, May 3, 2007

Steel U.C Construction


Description

The diagram outlines the production process of a Universal column.

Concrete Tilt up construction


Description

This is the construction process of the concrete tilt up panel. Additional detail will be shown on the Major assignment poster.

Date: 4.05.07