The diagram shows the importance of planning involved in concrete tilt up construction. The placement of the panels once lifted into position and the temporary bracing before connection to steel frame.
This picture shows Universal column with the reinforcing for concrete to be poured. The finished column is on the left and the work in progress is on the right.
Site Location
Multiplex Site Cnr, Bourke & William Street Melbourne
Connection of Universal column and Universal Beam. This photo also shos the reinforcment for concrete to be poured around the colunm for additional fire protection.
Site Location
Multiplex Site Corner Bourke Street, Williams Street Melbourne
Structural engineers sketch of Universal beam connection to existing concrete slab
Architectural detail- Corner of factory using non structural tilt up construction. The connection shows location but does not nominate the size of universal columns or panels.
The drawing shows the importance of the grid system and the relation of this to the structural and design detaing for the building. All drawings will relate to the image and grid set out by Architect.